Description
upvc Plug Tee 3″
GM made in Pakistan ASTM uPvc Sch-40 Pressure upvc Fittings, local fittings jeddah, ASTM D-2665 standard, construction plumbing building materials 0322-3540656
What is upvc Plug Tee 3″ GM ?
The following table summarizes key specifications for a standard 3″ UPVC Plug Tee GM (based on common SCH 40 standards; exact values may vary by manufacturer like Popular, Steelex, or AGM—consult local supplier for certifications):
| Parameter | Details |
|---|---|
| Size | 3 inches (nominal diameter: 75-90 mm ID, depending on schedule) |
| Material | UPVC (Un plasticized Polyvinyl Chloride) |
| End Type | Slip x Slip (socket) for run ends; Male-threaded or Grooved Male (GM) with plug on branch |
| Schedule/Thickness | SCH 40 (medium wall; suitable for pressure up to 150-200 PSI at 23°C) |
| Working Pressure | Up to 230 PSI (16 bar) at 20°C; derates with temperature (e.g., 100 PSI at 60°C) |
| Temperature Range | 0°C to 60°C (140°F max); not for hot water |
| Standards | ASTM D2467/D2665 (fittings), ISO 4422-3, GB/T 10002.2; NSF/ANSI 61 certified for potable water |
| Color | Typically white or light gray |
| Weight | Approx. 0.5-0.8 kg (varies by wall thickness) |
| Chemical Resistance | Excellent against acids, alkalis, salts; pH 2-12 |
For local variants (e.g., in regions like Pakistan or India), it complies with BS 5254 or IS 13592, emphasizing solvent weld or threaded joints.
Installation
Installation of a UPVC Plug Tee 3″ GM is straightforward and solvent-cement based for slip ends, or threaded for the GM branch. Follow these steps for safety and longevity (use PPE like gloves and eye protection; work in well-ventilated areas):
- Preparation: Cut pipes square using a PVC saw. Deburr edges with sandpaper or a deburring tool. Dry-fit all components to ensure proper alignment and interference fit (pipe should insert 1/3 to 2/3 of socket depth).
- Cleaning: Wipe sockets and pipe ends with a dry cloth to remove dust or moisture. Avoid oils or contaminants.
- Application: Apply UPVC primer to the pipe end and socket (purple for visibility). Follow with a medium-body UPVC cement using a dauber—coat pipe generously, socket lightly. Insert pipe into socket with a 1/4-turn twist for even spread. Hold for 30 seconds to set.
- Branch Plug: For the GM end, thread or groove-lock the male plug securely (use PTFE tape for threads if needed). Torque to manufacturer specs (typically 20-30 Nm) to avoid cracking.
- Curing: Allow 15-30 minutes cure



Reviews
There are no reviews yet.