Description
Steelex upvc pipe 6″ SDR41, 6 meter length.
Steelx Upvc , pipe 6” SDR 41 , price list, pipe fittings, Manufacturer Distributor Dealer Suppliers Karachi online shop, contact 0321-2248975
What is UPVC Pipe 6″ SDR41 ASTM Standard?
The manufacturer produces the Steelex UPVC Pipe 6″ SDR41 ASTM Standard as a 6-inch diameter pipe made from un plasticized polyvinyl chloride (UPVC), which meets the specifications of the ASTM D2665 standard.
The SDR (Standard Dimension Ratio) of 41 indicates the pipe’s wall thickness relative to its outside diameter.
Specifications:
- Material: UPVC
- Size: 6 inches
- SDR: 41
- ASTM Standard: ASTM D2665
- Maximum Operating Temperature: 140F or 60C
- Pressure Rating: Varies depending on specific application and installation conditions.
Applications:
Steelex UPVC Pipe 6″ SDR41 ASTM Standard is commonly used in various applications, including:
- Plumbing Systems: For transporting water and wastewater in residential, commercial, and industrial buildings.
- Irrigation Systems: For delivering water to agricultural fields, lawns, and gardens.
- Chemical Processing: For handling chemicals in industrial processes.
- Construction: For connecting pipes in building construction projects.
- Water Distribution: For transporting drinking water to communities.
How to Use:
- Cutting the Pipe: The 6 UPVC pipe can be easily cut using a saw or pipe cutter. Ensure smooth edges after cutting.
- Dry Fit: Before applying any solvent cement, dry-fit the pipes and fittings to ensure correct alignment and fit.
- Solvent Cement Application:
- Clean the ends of the pipe and the fitting socket.
- Apply a generous amount of UPVC solvent cement to both the pipes outer end and the fitting sockets inner surface.
- Insert the Pipe: Push the pipe into the fitting quickly after applying the cement. Hold in place for about 10-15 seconds to allow the bond to set.
- Curing Time: Allow the joints to cure for the recommended time (typically 24 hours) before exposing the pipe to pressure or flow.
- Pressure Testing: Once the system is assembled and cured, perform a pressure test to ensure there are no leaks before full operation.



Reviews
There are no reviews yet.