Description
Hydroplast sch 80 upvc End Cap 6″
Hydroplast Contact 0322-3540656, Sch-80 pvc fittings, suppliers in Pakistan. Karachi, Islamabad. Hydroplast sch 80 upvc End Cap 6″
What is Hydroplast sch 80 upvc End Cap 6″ ?
🔧 Description:
The Hydroplast SCH 80 UPVC End Cap 6″ is a pressure-rated pipe fitting used to seal the end of a 6-inch diameter UPVC pipe. It is specifically designed for Schedule 80 piping systems, providing thicker walls and greater pressure resistance compared to Schedule 40 caps.
Crafted from durable un plasticized polyvinyl chloride (uPVC), this end cap is perfect for industrial and commercial piping applications that demand strong, long-lasting seals.
📐 Key Specifications:
| Feature | Description |
|---|---|
| Brand | Hydroplast |
| Type | End Cap (Socket type) |
| Material | UPVC (Un plasticized Polyvinyl Chloride) |
| Schedule | 80 |
| Size | 6 inches (nominal diameter) |
| Color | Dark Gray (standard for SCH 80) |
| Standards | ASTM D2467, ASTM D1785 |
| Pressure Rating | Approx. 210–250 PSI at 23°C (varies with design) |
| Temperature Limit | Up to 60°C (140°F) |
⚙️ Common Usage Applications:
-
Pipe Termination:
Used to permanently or temporarily seal the end of a pipe in plumbing and industrial systems. -
Pressure Testing:
Allows systems to be pressurized for leak testing during commissioning or maintenance. -
Future Expansion:
Installed on pipelines where future connections or extensions are expected. -
Maintenance Isolation:
Helps in isolating a portion of the pipeline for cleaning or repair. -
Chemical Processing Plants:
Used in non-metallic corrosive fluid systems.
🛠️ Advantages:
-
High pressure tolerance (SCH 80 rated)
-
Corrosion and chemical resistance
-
Lightweight and easy to install
-
Long-lasting, low-maintenance solution
-
Non-conductive – ideal for electrical isolation
-
Compatible with solvent cement welding
🧰 Installation Tips:
-
Use appropriate PVC solvent cement and primer for bonding to pipe.
-
Ensure pipe end is clean, dry, and square-cut before inserting.
-
Hold cap in position briefly after pushing into pipe to ensure proper bond.
-
Allow adequate curing time before pressure testing.



Reviews
There are no reviews yet.